Hot-selling Automatic Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We have been also concentrating on enhancing the things management and QC method so that we could preserve terrific edge inside the fiercely-competitive enterprise for Instant Flood Water Barrier , Flood Solution , Flood Gates For Vehicles Passing , Striving hard to attain continual success determined by high quality, reliability, integrity, and complete understanding of current market dynamics.
Hot-selling Automatic Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Hot-selling Automatic Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot-selling Automatic Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot-selling Automatic Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Our enhancement depends around the sophisticated devices ,exceptional talents and repeatedly strengthened technology forces for Hot-selling Automatic Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Tunisia , Jersey , Liberia , For more than ten years experience in this filed, our company has gained high reputation from home and abroad. So we welcome friends from all over the world to come and contact us, not only for business, but also for friendship.

After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
5 Stars By Hilda from Nigeria - 2018.09.29 17:23
It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
5 Stars By Anna from Philippines - 2018.12.22 12:52