Wholesale Price China Flood Protection Solutions For Metro - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

As a way to provide you advantage and enlarge our organization, we even have inspectors in QC Crew and guarantee you our greatest assistance and product or service for Gate Aluminum Flood Barrier , Automatic Flood Device Without Personnel On Duty , Home Water Control Barrier , Clients to start with! Whatever you require, we should do our utmost to aid you. We warmly welcome prospects from everywhere in the entire world to cooperate with us for mutual enhancement.
Wholesale Price China Flood Protection Solutions For Metro - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Wholesale Price China Flood Protection Solutions For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Wholesale Price China Flood Protection Solutions For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Wholesale Price China Flood Protection Solutions For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

It adheres on the tenet Honest, industrious, enterprising, innovative to develop new items frequently. It regards buyers, success as its very own success. Let us produce prosperous future hand in hand for Wholesale Price China Flood Protection Solutions For Metro - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Israel , UK , Korea , We supply professional service, prompt reply, timely delivery, excellent quality and best price to our customers. Satisfaction and good credit to every customer is our priority. We focus on every detail of order processing for customers till they have received safe and sound products with good logistics service and economical cost. Depending on this, our products are sold very well in the countries in Africa, the Mid-East and Southeast Asia.

We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
5 Stars By Molly from Malta - 2018.12.28 15:18
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
5 Stars By Mavis from Malta - 2018.12.22 12:52