Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

With reliable excellent approach, great name and ideal consumer services, the series of products and solutions produced by our company are exported to many countries and regions for Water Activated Flood Barrier For Building , Flood Defense Barrier For Building , Flood Defense Gate , We warmly welcome your participation based on mutual benefits in the near future.
Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Just about every member from our large efficiency income crew values customers' wants and enterprise communication for Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Mongolia , Algeria , Amsterdam , Our company has built stable business relationships with many well-known domestic companies as well as oversea customers. With the goal of providing high quality products to customers at low cots, we've been committed to improving its capacities in research, development, manufacturing and management. We have honored to receive recognition from our customers. Till now we have now passed ISO9001 in 2005 and ISO/TS16949 in 2008. Enterprises of quality of survival, the credibility of development for the purpose, sincerely welcome domestic and foreign businessmen to visit to discuss cooperation.

Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
5 Stars By Chloe from Vietnam - 2018.02.08 16:45
With a positive attitude of regard the market, regard the custom, regard the science, the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
5 Stars By Tyler Larson from Poland - 2018.12.22 12:52