Quality Inspection for Inflated Flood Barrier - Embedded flood barrier Hm4e-0012C – JunLi Detail:
Model | water retaining height | installation mode | installation groove section | bearing capacity |
Hm4e-0012C | 1150 | embedded installation | width1540 * depth: 105 | heavy duty (small and medium-sized motor vehicles, pedestrian) |
Grade | Mark | Bearing capacity (KN) | Applicable occasions |
Heavy duty | C | 125 | underground parking lot, car parking lot, residential quarter, back street lane and other areas where only allow non-fast driving zone for small and medium-sized motor vehicles (≤ 20km / h). |
Embedded Installation of automatic flood barrier
(1) Embedded installation slot position:
a) It should be set behind the outermost intercepting ditch. Reasons: small water can be discharged through the intercepting ditch; when flood occurs, the municipal pipeline will be backfilled from the intercepting ditch when the water is full.
b) The higher the installation position, the higher the water retaining level.
(2) Discharge capacity of residual water in the installation tank:
a) A 50 * 150 water collecting tank is reserved at the bottom of the installation slot, and a Φ 100 drainage pipe is reserved at the bottom of the water collecting tank.
b) Discharge test: after pouring some water, the water can be discharged smoothly from the drain pipe.
(3) The levelness of the installation surface:
The installation surface horizontal height difference of the two sides should be ≤ 30mm (measured by laser level meter)
(4) The flatness of the installation surface:
According to the quality acceptance code of construction ground engineering GB 50209-2010, the surface flatness deviation should be ≤2mm ( applied 2m guiding ruler and wedge feeler gauge). Otherwise, the ground should be leveled first, or the bottom framework will leak after installation.
(5) Installation surface strength
a) The installation surface is made of at least C20 concrete with thickness ≥Y and the surrounding horizontal extension X ≥300mm or using equivalent strength of installation surface.
b) The installation surface should be free of cracks, hollowing, falling off , etc. The concrete should be qualified for the quality acceptance code of concrete structure engineering GB50204-2015, otherwise, need remade concrete installation surface according to the requirement.
c) In case of concrete, it should beyond curing period.
(6) Side walls
a) Side wall height should be higher than the flood barrier, otherwise it should be created.
b) The side walls should be made of solid brick or concrete or equivalent installation surface. If the wall is of metal or nonmetal material, relevant reinforcement should be applied.
How the hydrodynamic automatic flood barrier retain water
Product detail pictures:



Related Product Guide:
Always customer-oriented, and it's our ultimate target to be not only the most reliable, trustable and honest supplier, but also the partner for our customers for Quality Inspection for Inflated Flood Barrier - Embedded flood barrier Hm4e-0012C – JunLi, The product will supply to all over the world, such as: Qatar , Nigeria , Curacao , Our staffs are adhering to the Integrity-based and Interactive Development spirit, and the tenet of First-class Quality with Excellent Service. According to the needs of every customer, we provide customized & personalized services to help customers achieve their goals successfully. Welcome clients from home and abroad to call and inquire!

We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.

-
China Manufacturer for Flood Water Barrier - S...
-
Fixed Competitive Price Type Flood Gate Used Fo...
-
Cheap price Automatic Flood Protection Wall - ...
-
OEM/ODM China Floodgate Door Barrier - Surface...
-
2019 New Style Quick Dam Automatic Flood Defens...
-
China Factory for Flood Water Barriers - Embed...