PriceList for Quick Dam Flood Barriers - Embedded flood barrier Hm4e-0012C – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Our pursuit and company intention is usually to "Always fulfill our purchaser requirements". We go on to acquire and layout excellent high quality products for both our previous and new consumers and realize a win-win prospect for our customers too as us for Flood Barrier For Garage , Anti Flood Barrier , Gate Aluminum Flood Barrier , We are very proud of the good reputation from our customers for our products' reliable quality.
PriceList for Quick Dam Flood Barriers - Embedded flood barrier Hm4e-0012C – JunLi Detail:

Model water retaining height installation mode installation groove section bearing capacity
Hm4e-0012C  1150 embedded installation width1540 * depth: 105  heavy duty (small and medium-sized motor vehicles, pedestrian)

 

Grade Mark Bearing capacity (KN) Applicable occasions
Heavy duty C 125 underground parking lot, car parking lot, residential quarter, back street lane and other areas where only allow non-fast driving zone for small and medium-sized motor vehicles (≤ 20km / h).

Embedded Installation of automatic flood barrier

(1) Embedded installation slot position:

a) It should be set behind the outermost intercepting ditch. Reasons: small water can be discharged through the intercepting ditch; when flood occurs, the municipal pipeline will be backfilled from the intercepting ditch when the water is full.

b) The higher the installation position, the higher the water retaining level.

(2) Discharge capacity of residual water in the installation tank:

a) A 50 * 150 water collecting tank is reserved at the bottom of the installation slot, and a Φ 100 drainage pipe is reserved at the bottom of the water collecting tank.

b) Discharge test: after pouring some water, the water can be discharged smoothly from the drain pipe.

(3) The levelness of the installation surface:

The installation surface horizontal height difference of the two sides should be ≤ 30mm (measured by laser level meter)

(4) The flatness of the installation surface:

According to the quality acceptance code of construction ground engineering GB 50209-2010, the surface flatness deviation should be ≤2mm ( applied 2m guiding ruler and wedge feeler gauge). Otherwise, the ground should be leveled first, or the bottom framework will leak after installation.

(5) Installation surface strength

a) The installation surface is made of at least C20 concrete with thickness ≥Y and the surrounding horizontal extension X ≥300mm or using equivalent strength of installation surface.

b) The installation surface should be free of cracks, hollowing, falling off , etc. The concrete should be qualified for the quality acceptance code of concrete structure engineering GB50204-2015, otherwise, need remade concrete installation surface according to the requirement.

c) In case of concrete, it should beyond curing period.

(6) Side walls

a) Side wall height should be higher than the flood barrier, otherwise it should be created.

b) The side walls should be made of solid brick or concrete or equivalent installation surface. If the wall is of metal or nonmetal material, relevant reinforcement should be applied.

1 (1)

How the hydrodynamic automatic flood barrier retain water

3


Product detail pictures:

PriceList for Quick Dam Flood Barriers -
 Embedded flood barrier Hm4e-0012C – JunLi detail pictures

PriceList for Quick Dam Flood Barriers -
 Embedded flood barrier Hm4e-0012C – JunLi detail pictures

PriceList for Quick Dam Flood Barriers -
 Embedded flood barrier Hm4e-0012C – JunLi detail pictures


Related Product Guide:

We continue to keep increasing and perfecting our solutions and service. At the same time, we operate actively to do research and enhancement for PriceList for Quick Dam Flood Barriers - Embedded flood barrier Hm4e-0012C – JunLi, The product will supply to all over the world, such as: Salt Lake City , Colombia , Melbourne , They're durable modeling and promoting effectively all over the world. Under no circumstances disappearing major functions in a quick time, it's a really should in your case of excellent good quality. Guided by the principle of "Prudence, Efficiency, Union and Innovation. the company make a terrific efforts to expand its international trade, raise its company profit and raise its export scale. We're confident that we've been planning to possess a vibrant prospect and to be distributed all over the world within the years to come.
  • We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
    5 Stars By Honey from California - 2018.12.05 13:53
    It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Danny from United States - 2018.09.16 11:31