Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

continue on to further improve, to make sure product top quality in line with market and consumer standard requirements. Our firm has a excellent assurance program have already been established for Flood Defence , Quick Dam Flood Defense Barrier , Lift-Out Flood Barrier For Residential Building , We sincerely welcome customers from both at home and abroad to come to negotiate business with us.
Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

We normally think and practice corresponding on the change of circumstance, and grow up. We aim at the achievement of a richer mind and body and also the living for Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Palestine , Marseille , Iran , Our company has already had a lot of top factories and qualified technology teams in China, offering the best goods, techniques and services to worldwide customers. Honesty is our principle, skilled operation is our work, service is our goal, and customers' satisfaction is our future!

Managers are visionary, they have the idea of mutual benefits, continuous improvement and innovation, we have a pleasant conversation and Cooperation.
5 Stars By Daniel Coppin from Singapore - 2017.11.01 17:04
This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
5 Stars By Joyce from Iraq - 2018.10.09 19:07