Fast delivery Automatic Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We keep on with our business spirit of Quality, Performance, Innovation and Integrity. We goal to create much more worth for our customers with our rich resources, state-of-the-art machinery, experienced workers and exceptional providers for Flood Defense Barrier For Building , Flood Mitigation Products Supplier , Portable Water Barrier For Doors , With the tenet of faith-based, customer first, we welcome clients to call or e-mail us for cooperation.
Fast delivery Automatic Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Fast delivery Automatic Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Fast delivery Automatic Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Fast delivery Automatic Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

The business keeps to the operation concept scientific management, premium quality and efficiency primacy, customer supreme for Fast delivery Automatic Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Cologne , Mombasa , Sydney , We have 48 provincial agencies in the country. We also have stable cooperation with several international trading companies. They place order with us and export products to other countries. We expect to cooperate with you to develop a larger market.

We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
5 Stars By Cheryl from Mexico - 2017.08.18 18:38
Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
5 Stars By Teresa from azerbaijan - 2018.09.21 11:01