Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Our improvement depends on the superior equipment, excellent talents and continuously strengthened technology forces for Steel Water Dam , Self-Closing Flood Defense Barrier , Self Deploy Hydrodynamic Flood Barrier , We sincerely welcome domestic and overseas retailers who phone calls, letters asking, or to vegetation to negotiate, we will present you good quality goods as well as the most enthusiastic assistance,We glance forward in your check out and your cooperation.
Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

It is a good way to enhance our products and solutions and repair. Our mission will be to build creative solutions to consumers with a great experience for Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Bogota , Libya , Manchester , At present our sales network is growing continually, improving service quality to meet customer's demand. If you are interested in any products , please contact us at anytime. We are looking forward to forming successful business relationships with you in near future.
  • The company's products can meet our diverse needs, and the price is cheap, the most important is that the quality is also very nice.
    5 Stars By Rosemary from Guyana - 2017.11.11 11:41
    In China, we have purchased many times, this time is the most successful and most satisfactory, a sincere and realiable Chinese manufacturer!
    5 Stars By Jo from Boston - 2017.06.16 18:23