2019 High quality Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Sticking for the belief of Creating items of top of the range and creating buddies with people today from all over the world, we normally put the interest of shoppers in the first place for Automatic Flood Defense Gate , Home Flood Barrier , Watertight Flood Barriers , We cordially welcome customers from at home and abroad to join us and cooperate with us to enjoy a better future.
2019 High quality Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

2019 High quality Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

2019 High quality Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

2019 High quality Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Our target is always to satisfy our customers by offering golden support, superior value and high quality for 2019 High quality Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Philippines , Buenos Aires , Nepal , In order to carry out our goal of customer first and mutual benefit in the cooperation, we establish a specialist engineering team and a sales team to supply the best service to satisfy our customers' requirements. Welcome you to cooperate with us and join us. We have been your best choice.

This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
5 Stars By Daphne from Belgium - 2017.08.18 11:04
It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
5 Stars By Helen from Latvia - 2017.08.18 11:04